question

brady15811 avatar image
brady15811 asked ·

Personal Meeting IDs, What is the the impact of changing your PMI on previously scheduled or recurring meetings?

 What is the the impact of changing your PMI on previously scheduled or recurring meetings? Is it accurate that once you change your PMI, any meetings previously scheduled and/or recurring with the original PMI embedded will no longer be available? Can I have multiple meetings scheduled each with a different PMI that are still valid meetings?
topic-default
1 |1000 characters needed characters left characters exceeded

Up to 8 attachments (including images) can be used with a maximum of 1.0 MiB each and 10.0 MiB total.

jeff-salisbury7355 avatar image
jeff-salisbury7355 answered ·
Brady - I believe that after you change your PMI you will need to cancel and reschedule all previously scheduled meetings where you had specified that your PMI be used. We have had this happen to a few users.
Share
1 |1000 characters needed characters left characters exceeded

Up to 8 attachments (including images) can be used with a maximum of 1.0 MiB each and 10.0 MiB total.

brady15811 avatar image
brady15811 answered ·
Thank you! I was afraid that was the answer.
Share
1 |1000 characters needed characters left characters exceeded

Up to 8 attachments (including images) can be used with a maximum of 1.0 MiB each and 10.0 MiB total.

Write an Answer

Hint: Notify or tag a user in this post by typing @username.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MiB each and 10.0 MiB total.

Customer Spaces