question

Brandon Smith avatar image
Brandon Smith asked ·

How long to graduate to production?

Bigleaf Networks has an app, Odoo Production, client ID U0EjjKeCSjeeNX0YnnevZw, that was submitted for review on Friday, 12/13/2019. When should we expect to get moved to production? We understood it was take up to 24 hours.

graduation
1 |1500 characters needed characters left characters exceeded

Up to 8 attachments (including images) can be used with a maximum of 1.0 MiB each and 10.0 MiB total.

Anirban avatar image
Anirban answered ·

Please send a mail to devsupport@ringcentral.com with your client id clarifying them the urgency you have. They will look into this


1 |1500 characters needed characters left characters exceeded

Up to 8 attachments (including images) can be used with a maximum of 1.0 MiB each and 10.0 MiB total.

Phong Vu avatar image
Phong Vu answered ·

Sorry for the delay! I think it was because the weekend and long list of apps waiting for approval. I just graduated your app so you should receive an email notification soon.

1 |1500 characters needed characters left characters exceeded

Up to 8 attachments (including images) can be used with a maximum of 1.0 MiB each and 10.0 MiB total.

Developer sandbox tools

Using the RingCentral Phone for Desktop, you can dial or receive test calls, send and receive test SMS or Fax messages in your sandbox environment.

Download RingCentral Phone for Desktop:

Tip: switch to the "sandbox mode" before logging in the app:

  • On MacOS: press "fn + command + f2" keys
  • On Windows: press "Ctrl + F2" keys