question

Brandon Smith avatar image
Brandon Smith asked Phong Vu answered

How long to graduate to production?

Bigleaf Networks has an app, Odoo Production, client ID U0EjjKeCSjeeNX0YnnevZw, that was submitted for review on Friday, 12/13/2019. When should we expect to get moved to production? We understood it was take up to 24 hours.

graduation
1 |3000

Up to 8 attachments (including images) can be used with a maximum of 1.0 MiB each and 10.0 MiB total.

Anirban avatar image
Anirban answered

Please submit a help ticket with your client ID clarifying the urgency you have. The developer support team will look into this.

1 |3000

Up to 8 attachments (including images) can be used with a maximum of 1.0 MiB each and 10.0 MiB total.

Phong Vu avatar image
Phong Vu answered

Sorry for the delay! I think it was because the weekend and long list of apps waiting for approval. I just graduated your app so you should receive an email notification soon.

1 |3000

Up to 8 attachments (including images) can be used with a maximum of 1.0 MiB each and 10.0 MiB total.

Developer sandbox tools

Using the RingCentral Phone for Desktop, you can dial or receive test calls, send and receive test SMS or Fax messages in your sandbox environment.

Download RingCentral Phone for Desktop:

Tip: switch to the "sandbox mode" before logging in the app:

  • On MacOS: press "fn + command + f2" keys
  • On Windows: press "Ctrl + F2" keys